CWF Lot 2B - Roger Howe Concrete Repairs and Joint Replacement works Stage Two
In plain English
The notice doesn't say
The notice as published
In December 2025 investigatory works were undertaken to establish the condition of the reinforced concrete, concentrating mainly around half-joints and movement joints in the bridge deck. The results of these investigations have been incorporated in a set of construction drawings and a repair specification. This information will form the basis of a Stage 2 contract to implement repairs and replacement of movement joints.