Transport study
In plain English
The notice doesn't say
The notice as published
The contract is required to enable evidence to be produced for the Local Plan timetable to be met - a corporate priority. To prepare a contract for consultants to produce the Bassetlaw Transport Study To produce a Transport Study for Bassetlaw District - Stage 1 and 2 To produce Stage 3 Transport Study - terms to be agreed following outcome of 1 and 2 evidence work as per the scope of the work detailed in proposal letter Contract Period: 16.08.2026 till 15.08.2027 Contract value: £70,000 + VAT Procured ESPO FW ref 664/25 https://www.find-tender.service.gov.uk/Notice/075644-2025