Nent Haggs Optimisation
In plain English
The notice doesn't say
The notice as published
This contract was awarded following a further competition from the Mining Remediation Authority's Research and Development Dynamic Purchasing System Lot 2 This requirement is for ongoing treatment optimisation at Nent Haggs Mine Water Treatment Works. The package of works is to be phased over a four year programme, The site has been operational since September 2024, with Treatment Pond 1 (TP1) brought online in accordance with planning conditions. Contaminated mine water has been entering TP1 at a controlled flow rate. Since commissioning, the passive treatment system has successfully removed an dissolved zinc from the inflowing mine water. The next stage of commissioning involves a structured optimisation programme aimed at enhancing treatment performance at Nent Haggs and informing the development of future passive mine water treatment systems for the Mining Remediation Authority.