SFRA Update
In plain English
The notice doesn't say
The notice as published
Update to SFRA . This contract is to undertake an updated Strategic Flood Risk Assessment (SFRA) to replace the existing Level 1 (2019) and Level 2 (2021) assessments and support the preparation and adoption of the East Riding Local Plan (2029).