Hackney Service Centre cooling system redesign feasibility study
In plain English
The notice doesn't say
The notice as published
The purpose of this contract is to appoint a lead Architect, working in collaboration with a specialist Mechanical & Electrical Engineer and a Quantity Surveyor, to deliver a comprehensive feasibility study for replacing the end of life secondary cooling system across all 5 floors of the Hackney Service Centre (HSC), located at 1 Hillman Street. The contract is being awarded as a Direct Award from AMD Professional Consultancy Services Framework Lot 1.