CWF Lot 2A - Garrigill Retaining Wall Rebuild
In plain English
The notice doesn't say
The notice as published
The contract will be to undertake the design and rebuild of a new section of retaining wall. The wall is retaining approximately 2.9m of highway above and the collapsed length is approximately 7m. The retaining wall sits on top of a rock face, which extends down to the river. No work is expected to the rock face. An out of river method of working is preferred.