Camden Building Term Service Contract 4 - Void Refurbishment South
In plain English
The notice doesn't say
The notice as published
• Lock changes for all properties. • Appropriate landlord compliance checks and certificates: Landlord Gas Safety test, electrical safety tests, asbestos survey and removal, if required, water hygiene safety test, if required, and Energy Performance Certificates (EPC’s), if required. • Clearances and cleaning of properties and associated gardens, where required • Repairs/works required to reinstate the property prior to the next tenant moving in • Lock changes for all properties. • Appropriate landlord compliance checks and certificates: Landlord Gas Safety test, electrical safety tests, asbestos survey and removal, if required, water hygiene safety test, if required, and Energy Performance Certificates (EPC’s), if required. • Clearances and cleaning of properties and associated gardens, where required • Repairs/works required to reinstate the property prior to the next tenant moving in: o Finishes: repair or, where required replacement, of plaster finishes, wallboards, ceiling boards, preparation and decoration of surfaces, floor coverings, tiling, wallpaper etc. o Kitchen fittings: repair or, where required replacement, of wall and floor mounted cupboards, carousels, sink tops, worktops. o Bathroom fittings: repair or, where required replacement, of baths, showers, wash hand basins WCs, cisterns and all accessories. o Electrical installations: repair or, where required replacement, of concealed and surface mounted wiring, consumer units, controls, switches, switchgear, timers and outlets. o Plumbing and waste: repair or, where required replacement, of domestic heating, water and waste services including boilers, pipes, valves, tanks, cylinders, outlets, pumps and connections to drains.