Heat Network Pilot Borehole
In plain English
The notice doesn't say
The notice as published
A two-stage contract, with the design and pricing of the boreholes forming the development phase and the exploration package consisting of the drilling and testing of the boreholes. The appointed Contractor will be expected to adopt the roles of Principal Designer and Principal Contractor under CDM regulations. A competent drilling contractor (the Contractor) is being sought with a demonstrable track record of successfully drilling through and into mine workings at up to c.600m depths