Provision of Parts for the Construction of a Physical Vapour Deposition System
In plain English
The notice doesn't say
The notice as published
The University has a requirement for the Provision of Parts for the construction of a Physical Vapour Deposition System. This requirement is split into four (4) Lots. Lot 1 - Provision of 5Kw Pulsed DC Power Supplies Lot 2 - Provision of a High Frequency 6Kw Power Supply for Substrate Bias Lot 3 - Provision of a 1600 litre per second turbomolecular pump Lot 4 - Provision of a dry pump (circa 1000 litres per min)