ID 4334927 - DfI - DVA - Weighbridge Repair, Maintenance, Calibration and Level Surveying Contract
In plain English
The notice doesn't say
The notice as published
The Driver and Vehicle Agency (Enforcement Section) require a Contractor to carry out maintenance, testing, verification and repair of its weighbridge network, following the expiry of the existing contract on 31 March 2023. This includes the surveying and repair of concrete approach levels, the surveying of weighpad sites and ad-hoc civil engineering works. Tenderers should refer to the Specification for further details. The Driver and Vehicle Agency (Enforcement Section) require a Contractor to carry out maintenance, testing, verification and repair of its weighbridge network, following the expiry of the existing contract on 31 March 2023. This includes the surveying and repair of concrete approach levels, the surveying of weighpad sites and ad-hoc civil engineering works. Tenderers should refer to the Specification for further details.