PRO004736-Works-Framework-Build Only

United Utilities Water Limited · published Fri 27 Dec 2024

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The notice doesn't say where the documents are, but United Utilities Water Limited's other tenders use EU-Supply. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

United Utilities has concluded the process of awarding framework agreements for it's Build Only delivery runway. These frameworks form part of the design and build delivery runway within our AMP8 operating model. Framework agreements have been awarded for construction of assets in two Lots: Lot 1 - Non-Infrastructure Lot 2 - Infrastructure Lot 1 Non-Infrastructure: Water Treatment, Waste Water Treatment, Pumping Stations & Storage, Reservoirs, Bio Resources and Energy. Work types that form part of the Lot 1 Non-Infrastructure works (non-exhaustive) include: • Sludge treatment Bio-digesters • Chemical Dosing Rigs • Primary, secondary & tertiary wastewater treatment process • Gas Holders • MEICA Installation and commissioning • Presses • Combined Heat and Power • Access Roads and Site Facilities • Other construction works. Lot 2 Infrastructure: Water Networks & Water Network Pipelines, Wastewater Networks & Wastewater Network Pipelines, Pumping Stations & Storage and Reservoirs. Work types that form part of the Lot 2 Infrastructure works (non-exhaustive) include: • Pump Installations • Concrete in-situ tank installations • Pre-fabricated tanks • CSO chamber installations & pump return • Sewer upsizing and installations • Screen installations • MEICA Installation and commissioning • Access Roads and Site Facilities • Other construction works.