Wider Ecosystem
In plain English
The notice doesn't say
The notice as published
Delivering Northumbrian Water Limited's (NWL) AMP8 programme, and beyond, will require a step change in how we collaborate, manage risk and co-ordinate our capital investment. We have developed a clear vision and process for how we want to deliver our plan and our ambitious transformation programme to implement this roadmap has already commenced with the award of framework agreements for professional services contracts. These lay the foundations for our new supply chain landscape or 'Living Water Ecosystem'. This award notice is in relation to the Wider Ecosystem. A separate notice for the Living Water Enterprise lots (FA08-01) was published on completion of that procurement process. Short Cycle Work: NWL's Integrated Delivery Services (IDS) team delivers lean and agile short cycle capital investment works on our water and wastewater assets, as well as delivering infrastructure services for our developer customers. The IDS team will be supported by the appointed Wider Ecosystem partners. The Wider Ecosystem will also provide additional resource and support to the Living Water Enterprise partners when delivering long cycle work. NWL have appointed a number of suppliers to the following lots: Wider Ecosystem Lots FA08-02 - Lot A - Infrastructure Civil Engineering (North East) o Sub lot 1 - £0-£2.5m o Sub lot 2 - £0-£5m - Lot B - Treatment and Civils (North East) o Sub lot 1 - £0-£2.5m o Sub lot 2 - £0-£5m - Lot C - Treatment and Civils (Essex & Suffolk) o Sub lot 1 - £0-£2.5m o Sub lot 2 - £0-£5m - Lot D - Demolition and Associated Services (North East) - Lot E - Demolition and Associated Services (Essex & Suffolk) - Lot F - Multi-Disciplinary Civil Engineering - Non-Water Experience (North East) - Lot G - Multi-Disciplinary Civil Engineering - Non-Water Experience (Essex & Suffolk) - Lot H - Civil and Environmental Engineering (North East and Essex & Suffolk) Wider Ecosystem Lot A 1 - Infrastructure Civil Engineering (North East) - £0-£2.5m The Client has appointed several infrastructure civil construction Contractors in the Northumbrian Operating area to deliver projects across its capital investment programme. The Contractors will become partners as part of the Northumbrian Water's Living Water Ecosystem, working alongside the Enterprise and directly for Northumbrian Water's Integrated Delivery Services (IDS), focused on outcomes and mutual goals placing optimised delivery as one of its key priorities. The Contractors will embrace collaboration, drive and promote best practice, engender an environment of continuous learning and improvement whilst efficiently delivering the investment portfolio across the operating region. The Scope of work includes construction and commissioning of new water and wastewater infrastructure assets, asset renewals, asset modifications and refurbishments. The Scope involves programmes of work by asset, work type, geography and / or by specialism. These programmes will be for predominantly infrastructure works with some treatment works; and can be district to regional wide; multiple small to medium scale, civil interventions; small groups of medium sized and / or medium complex projects. Throughout the duration of the Framework Agreement there will be small, medium or emerging issues of a more business critical nature which may need to be delivered on an individual basis. The Client's aim is to create a wide ranging and diverse eco-system of Contractors to compliment the Living Water Enterprise and its partners in addition to our integrated delivery services. To aid this, the works for this Framework are intended to be split into two Sub-lots; from £0m to £2.5m (Sub-lot 1) & £0m to £5.0m (Sub-lot 2) as indicated below. Sub-lot 1: £0m to £2.5m: The Scope could include but is not limited to: • Storm Overflow spill reductions to comply with new legislative requirements as translated into the government's storm overflow discharge reduction plan and Environment Agency Water industry national environment programme (WINEP) guidance. Our PR24 plan is to improve priority overflows to meet 'harm' and public health targets. The scope will include but not limited to the installation of singular & multiple solutions: • Surface water separation; • upsizing of combined sewers; • Trenchless pipework installation; • off-line and on-line underground tank solutions; • installation of nature-based solutions; • Installation of screening controls; • Construction and reconstruction of screened storm overflows and associated hydraulic control; • Decommissioning and abandonment of the existing network assets; • Independent from Storm overflows, the scope includes named flood alleviation and pollution remediation projects. • sewer rehabilitation programme, in the context of trenchless technology. CCTV investigations, cleansing, root-cutting, repairing, replacing or upgrading existing sewer pipes such as pipe bursting, pipe relining and patching/sealing technologies. Scope specifically for sewer Grade 4 & 5 sewer rehabilitation repairs. • programme of inspection of our sea outfall structures and minor repairs. Major repairs identified will be delivered in the scope through named projects. • minor works and full refurbishment projects at our network water/sewage pumping stations. Scope will include a programme of work on network sewage pumping station rising mains for maintenance, repair and replacements. Scope to include Operational Technology programme for replacement of obsolete telemetry outstations and associated equipment. • New Development (ND) and New Road and Street Works Act (1991) requests for enabling projects on our sewer assets. Projects identified will require installation of assets for diversions or protection. Wider Ecosystem Lot A2 - Infrastructure Civil Engineering (North East) - £0-£5m The Client has appointed several infrastructure civil construction Contractors in the Northumbrian Operating area to deliver projects across its capital investment programme. The Contractors will become partners as part of the Northumbrian Water's Living Water Ecosystem, working alongside the Enterprise and directly for Northumbrian Water's Integrated Delivery Services (IDS), focused on outcomes and mutual goals placing optimised delivery as one of its key priorities. The Contractors will embrace collaboration, drive and promote best practice, engender an environment of continuous learning and improvement whilst efficiently delivering the investment portfolio across the operating region. The Scope of work includes construction and commissioning of new water and wastewater infrastructure assets, asset renewals, asset modifications and refurbishments. The Scope will involve programmes of work by asset, work type, geography and / or by specialism. These programmes will be for predominantly infrastructure works with some treatment works; and can be district to regional wide; multiple small to medium scale, civil interventions; small groups of medium sized and / or medium complex projects. Throughout the duration of the Framework Agreement there will be small, medium or emerging issues of a more business critical nature which may need to be delivered on an individual basis. The Client's aim is to create a wide ranging and diverse eco-system of Contractors to compliment the Living Water Enterprise and its partners in addition to our integrated delivery services. To aid this, the works for this Framework are intended to be split into two Sub-lots; from £0m to £2.5m (Sub-lot 1) & £0m to £5.0m (Sub-lot 2) as indicated below. Whilst it is envisaged that the bulk of works will be civils based there is an expectation and requirement from the Client that the Contractors have experience with telemetry and MEICA (Mechanical, Electrical, Instrumentation, Control and Automation). The Scope could include but is not limited to: • Storm Overflow spill reductions to comply with new legislative requirements as translated into the government's storm overflow discharge