Kestrel

PRO004751-Works-Framework-Minor Works

United Utilities Water Limited · published Thu 6 Mar 2025

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The notice doesn't say where the documents are, but United Utilities Water Limited's other tenders use EU-Supply. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

United Utilities has concluded the process of awarding framework agreements for it's Minor Works delivery runway. These frameworks form part of the build only delivery runway within our AMP8 operating model. Framework agreements have been awarded for construction of assets in two Lots: Lot 1 - Civils Construction Lot 2 - Mechanical & Electrical Installation Lot 1 Civils Construction: Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s. Work types that form part of the Lot 1 Civils Construction works include:  Sludge treatment digesters and tanks  Chemical Dosing Rigs  Primary, secondary & tertiary wastewater treatment process  Gas systems  CSO chamber installations & pump return  Sewer/Large Diameter Trunk Mains upsizing and installations  Buried pipework  Demolition  Fish Passages  Pre-fabricated tanks  Concrete in-situ tank installations  Media Changes  Boreholes  Access Roads and Site Facilities  Other construction works Lot 2 Mechanical & Electrical: Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s Work types that form part of the Lot 2 Mechanical & Electrical Installation works include:  Sludge treatment, digestion, handling and pumping  CHP Engines  Chemical Dosing Rigs  Pumps and pumping systems  Primary, secondary & tertiary wastewater treatment process  Instrumentation and alarms  Safety Instrumented Systems  Above-ground pipework  Valves and actuators  Pressure vessels and boilers  Heat exchangers  Gas systems including storage, consumers, pipework and ancillaries  Equipment and protective systems for use in explosive atmospheres  CSO chamber installations & pump return  Screen & weir installations  MEICA Installation and commissioning  Other M&E Installation works.