PRO004751-Works-Framework-Minor Works
In plain English
The notice doesn't say
The notice as published
United Utilities has concluded the process of awarding framework agreements for it's Minor Works delivery runway. These frameworks form part of the build only delivery runway within our AMP8 operating model. Framework agreements have been awarded for construction of assets in two Lots: Lot 1 - Civils Construction Lot 2 - Mechanical & Electrical Installation Lot 1 Civils Construction: Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s. Work types that form part of the Lot 1 Civils Construction works include: Sludge treatment digesters and tanks Chemical Dosing Rigs Primary, secondary & tertiary wastewater treatment process Gas systems CSO chamber installations & pump return Sewer/Large Diameter Trunk Mains upsizing and installations Buried pipework Demolition Fish Passages Pre-fabricated tanks Concrete in-situ tank installations Media Changes Boreholes Access Roads and Site Facilities Other construction works Lot 2 Mechanical & Electrical: Water Treatment and Network Pipelines, Waste Water Treatment and Network Pipelines, Bioresources, Pumping Stations & Storage, CSO’s Work types that form part of the Lot 2 Mechanical & Electrical Installation works include: Sludge treatment, digestion, handling and pumping CHP Engines Chemical Dosing Rigs Pumps and pumping systems Primary, secondary & tertiary wastewater treatment process Instrumentation and alarms Safety Instrumented Systems Above-ground pipework Valves and actuators Pressure vessels and boilers Heat exchangers Gas systems including storage, consumers, pipework and ancillaries Equipment and protective systems for use in explosive atmospheres CSO chamber installations & pump return Screen & weir installations MEICA Installation and commissioning Other M&E Installation works.