Kestrel

Framework for Professional Consultancy Services

The Council of the Borough of Kirklees · published Thu 11 Sep 2025

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The notice doesn't say where the documents are, but The Council of the Borough of Kirklees's other tenders use EU-Supply. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

The Council of the Borough of Kirklees ("the Council") intends to procure a Framework for the Provision of Professional Consultancy Services compromising of the following Lots: Lot 1 - Architecture and Multi-Disciplinary Lot 2 - Project Management Lot 3 - Quantity Surveying Lot 4 - Mechanical and Electrical Engineering Lot 5 - Structural /Light Civil Engineering Lot 6 - Lift Consultancy Lot 7 - Building Surveying Lot 8 - Clerk of Works Lot 9 - Conservation & Heritage Advice (Architecture) The Framework was procured in accordance with the Open procedure under the Public Contracts Regulations 2015. The estimated value of the Framework is approximately (£9,260,000.00) over 4-years. Information and documentation relating to the framework agreement was published on YORtender - https://yortender.eu-supply.com. The services performed on the framework will be in strict accordance with Kirklees Councils conditions including the project management handbook which will be published with the tender. This details an adaptation of the RIBA stages in line with the following: • Stage 1 - Project Initiation • Stage 2 - Project Development & Approval • Stage 3 - Design • Stage 4 - Tendering • Stage 5 - Construction • Stage 6 - Project Completion & Review The Scope of Services for Architecture shall comprise the provision of design services including designs, specifications, advice and information with due regard to functionality, build quality and impact, build-ability, construction safety, operation and maintenance . The Consultant will be required to provide a level of resource to achieve the programme for a specific commission and the resource proposed shall be both competent and suitably qualified to provide the required level of service for the complexity of the specific commission. This Lot requires that Architects hold, as a minimum, RIBA accreditation. The Scope of Services for Multi-Disciplinary shall comprise the provision of design services including designs, specifications, advice and information with due regard to functionality, build quality and impact, build ability, construction safety, operation and maintenance. The disciplines covered shall be Architecture, Mechanical and Electrical Engineering, Structural/Light Civil Engineering and Landscape Architecture. The Lead Consultant under a multi-disciplinary commission will always be the Architect unless specifically requested otherwise by the Client. The Scope of Services for Project Management shall principally involve the Project Manager acting as virtual extension of the Council's own staff, which enables the Council to be in control of the project at all times, whilst ensuring that the management role within the project is fulfilled. This will comprise undertaking Project Management Services to manage and control projects in terms of all aspects of 'Time, Cost and Quality' from project inception to completion, to include (but not limited to): - Development and Implementation of Governance, Communication and Reporting Plans; - Programme Management; - Cost/Budget Management; - Implementing Change Control Processes; - Risk Management; - Management and Co-ordination of Project Team Members and Consultants, and the information produced; - Advising the Client at all stages of their required Statutory and Health and Safety Obligations and Duties i.e. Client Responsibilities under the CDM Regulations and Building Safety Act and ensuring that these duties and obligations are fulfilled/carried out. The Scope of Services for Quantity Surveying shall cover all the key duties outlined in the Specification for Stages 1 to 6 for all Contracts. The Consultant will be required to provide a level of resource to achieve the programme for a specific commission and the resource proposed shall be both competent and suitably qualified to provide the required level of service for the complexity of the specific commission. This Lot requires that Consultants hold, as a minimum, RICS Accreditation. The Scope of Services for Mechanical and Electrical Engineering shall comprise the following work elements: - Mechanical: - Acoustical design and Treatment in connection with the engineering services; - Air Conditioning and Mechanical Ventilation Services; - Boiler plants and Auxiliaries; - Building Energy Management Systems; - HVAC control Systems; - Calorifier plants; - Cold Water Services; - Cooling-Water Services; - Pipework and Fittings; - Fire Protection Services; - Fuel Gas Incoming Supply and Distribution; - Heating Installations; - Hot Water Services; - Public Health and Plumbing Services; - Refrigeration Installations; - Thermal Insulation; - Vibration control in connection with the engineering services; - Water Treatment and Filtration; - Kitchen (Commercial) Supply and Extract Installations; - Renewable Technologies; - Thermal Modelling Analysis; and - Building Information Modelling (BIM) - Provide cost estimates, evaluation of tenders and variation review - Electrical: - Incoming Electrical Supplies (New and Upgrading); - EV Electrical Distribution Services; - Electricity Lighting and Power Installations, including fittings; - Standby and emergency lighting installations, including fittings; - Fire Detection and Alarm Services or Power and Containment for Fire Detection and Alarm Services; - Security system installations (intruder alarm, access control, Minor CCTV) or Power and Containment for Security System installations; - External amenity lighting and floodlighting; - Electrical power and containment for Mechanical plant; - Earthing and bonding systems; - Structured cabling installations or containment for structured cabling installations (Voice, Data and Communications); - Energy metering and monitoring systems; - Specification Lot 4 (Mechanical and Electrical Engineering) Public address, Personnel location and call services or Power and Containment for public address, Personnel location and call services (generally Assistance Call Systems in housing accommodation or PA systems in Market Halls); - Telephone equipment or distribution services; Radio and television installations or Power and Containment for radio and television - installations; - Renewable Technologies; and Ancillary Electrical items (Induction Loops, Soundfield systems and other facilities for disabilities) Building Information Modelling (BIM) Provide cost estimates, evaluation of tenders and variation review The Scope of Services for Structural & Light Civil Engineering shall comprise the following work elements: Earthworks and excavation; Foundations including forms of piling but not the design of the piling; Earth and water retaining structures including reinforced earth; Ground and surface treatment; Local and main, public health and land drainage; inspection chambers, sewers, interceptors, tanks, treatment works and ground dewatering; Paving and surfacing; roads, car parks and footpaths; Structures in in-situ or precast concrete employing unreinforced, reinforced or pre-stressed techniques; Structures in masonry, brickwork or blockwork, unreinforced or reinforced; Structures in Demolition of structures; Metalwork, ferrous or non-ferrous; Building information modelling (BIM); and Provide cost estimates, evaluation of tenders and variation review The key task is the provision of lift consultancy services on selected schemes and programmes of work. The Scope of Services for Building Surveying shall comprise the following work elements, irrespective of whether the Consultant is providing the work elements under a Single Discipline commission (in which case the Consultant will also act as Lead Consultant in accordance with the requirement of this Specification) or under a Multi-Disciplinary commission (in which case the Consultant will be appointed as part of a wider design team and will report to a Lead Consultant): Providing cost information for use in the council's asset management portfolio; Investigations and feasibility studies including cost