De-silt and Repairs to Elm Pond, Wallington - London Borough of Sutton
In plain English
The notice doesn't say
The notice as published
The London Borough of Sutton would like to carry out works to de-silt and repair Elms Pond in Wallington. The Budget for this Project is in the range of £25- 30k maximum, of which at least £5k should be set aside to carry out any necessary identified and agreed repair works. Elm Pond is located in the Wallington North Ward. A site visit is recommended before submitting a tender to familiarise yourself with the location and area. Please refer to the specification for full details.