Herring and Haven Bridge
In plain English
The notice doesn't say
Who holds it now
Last won by Herts Enviro Services Ltd in Aug 2026, for £1.9m.
- Water Hygiene Legionella Management and LTHW Testing Herts Enviro Services Ltd £1.9m
- Provision of Inspection and certification of LOLER & PSSR Assets for Insurance Requirements and Regulatory Inspections Mand (PLS) Ltd £45k
- Real time passenger information at bus stops Nexus Alpha Limited £7m
What you're up against
- The last two awards went to different firms: this buyer has changed supplier before.
- 3 different firms won this buyer's 3 awards for this kind of work in 2026.
- It last went for £1.9m in 2026.
The notice as published
Norfolk County Council is responsible for the maintenance of the Haven Bridge, and the maintenance and operation of the Herring Bridge, which are both twin-leaf lifting bridges located in the port town of Great Yarmouth. The Haven Bridge is operated by Peel Ports on behalf of Great Yarmouth Port Authority, who have a statutory obligation to operate the bridge for navigation. On 19 November 2025, the Minister of State for Local Government and Homelessness made a written statement [UIN HCWS1071] saying that three proposals for unitary local government in Norfolk had been received - these could entail the creation of one, two or three unitary councils. The Minister announced a consultation exercise, which ended on 11 January 2026. The Minister stated that "once the consultations have concluded, the Government will assess the proposals against the criteria in the invitation and decide, subject to parliamentary approval, which, if any, proposals are to be implemented, with or without modification. On 4 December 2025, the Secretary of State for Local Government made a written statement [UIN HCWS1128] stating that the government intends to establish a Mayoral Strategic Authority for Norfolk and Suffolk as soon as possible, and that it is minded to hold inaugural mayoral elections in May 2028. Should these processes lead to unitary local government in Norfolk and/or to the establishment of a Mayoral Strategic Authority covering Norfolk (i) the contract may be transferred, assigned or novated to any successor authority(ies) to the council, or to any joint body incorporating or formed by any such successor and/or to any Mayoral Strategic Authority; and/or (ii) the council or a successor authority or joint body may order services on behalf of other local authorities serving any area within Norfolk's current geographical boundaries. The following maintenance services are required: 1) Maintenance (planned and reactive). 2) Planned and reactive maintenance of road traffic equipment including movable barriers, flashing beacons, audible warnings and CCTV. 3) Providing support to the emergency services in case of maritime or road traffic accident, chemical spillage, fire or other incident. 4) LOLER and weekly walkover inspection. Full details of the requirement can be found in the Service Specification, which forms a Schedule to the Terms and Conditions. The following operation services are required: 1) Operation of the bridge 24/7/365 from a manned control tower on site. 2) Soft and hard facilities management [planned and reactive] of the control buildings, control tower and welfare facilities including cleaning, HVAC, and domestic electrical, plumbing and heating systems. Full details of the requirement can be found in the Service Specification, which forms a Schedule to the Terms and Conditions.