Kestrel

Pitched Roofing Refurbishment - 63-69 Tollgate Road, Andover

Aster Group Limited · published Wed 3 Dec 2025

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The notice doesn't say where the documents are, but Aster Group Limited's other tenders use In-Tend. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

Procurement for works for main hipped roof refurbishment to flat block owned and maintained by Aster Group and Private Leaseholders with the following address - 63 to 69 Tollgate Road, Andover, SP10 3RF. The project is comprised of the following responsibilities: Pre-Works Identify vents/fans needing disconnection. Check for live gas or solid fuel appliances before chimney removal; get Aster Surveyor approval. Agree flue isolation, venting, and blocking up with residents and Aster Surveyor. Scaffolding Erect tubular steel scaffold with access for chimney removal. Measure to building face and include lift heights. TV & Satellite Relocate and reinstate 2 satellite dishes and 4 aerials. Test signals. Live aerials to be moved to loft post-removal. Chimney Removal Remove pots, flaunching, and chimney to below roof level. Cap and vent flues. Clear all waste. Structural Works Install new rafters, ridge timbers, and noggins to fill chimney void. Roof Strip & Insulation Remove tiles, battens, felt. Clear debris and install 50–75mm PIR insulation with ventilation gap. Roof Rebuild Fit breathable membrane, battens, and new tiles (Redland/Marley). Match colour to existing. Install dry ridge/hip tiles. Eaves & Guttering Fit eaves trays and rafter roll. Clean and retain existing gutters if serviceable; replace if not. Clean fascias/soffits if in good condition. Completion Test gutters for leaks and falls. Clean all windows, doors, fascias, and leave site tidy.