Electrical Installations Repairs & Maintenance (EIRM) Term Contracts
In plain English
The notice doesn't say
The notice as published
This project aims to appoint two term contractors for electrical installations, repairs and maintenance, to start January/February 2027 for an initial period of five years with the option to extend at the council's discretion for up to a further two years in yearly increments. Contract A will serve the north of the borough and Contract B will serve the south of the borough. The successful contractors will act as back-up to each other on their tendered rates to ensure that the council is able to meet its obligations. The scope of works will be: electrical refurbishments to communal landlords systems; landlord lighting and lightning protections systems; installation of fire, smoke and heat detection systems; fire detection system and AOV systems; solar PV systems; generators and Uninterrupted Power Supply (UPS) systems and changeover switch testing; Electrical Installation Condition Reports (EICR) – inspection and reporting of fixed wiring in domestic properties and communal areas. Bermondsey, Rotherhithe, Walworth and Borough and Bankside The proposed scope of works will be; electrical refurbishments to communal landlords systems; landlord lighting and lightning protections systems; installation of fire, smoke and heat detection systems; fire detection system and AOV systems; solar PV systems; generators and Uninterrupted Power Supply (UPS) systems and changeover switch testing; Electrical Installation Condition Reports (EICR) – inspection and reporting of fixed wiring in domestic properties and communal areas. Camberwell, Dulwich, Peckham and Nunhead The proposed scope of works for the new electrical maintenance and installations contract will be; electrical refurbishments to communal landlords systems; landlord lighting and lightning protections systems; installation of fire, smoke and heat detection systems; fire detection system and AOV systems; solar PV systems; generators and Uninterrupted Power Supply (UPS) systems and changeover switch testing; Electrical Installation Condition Reports (EICR) – inspection and reporting of fixed wiring in domestic properties and communal areas.