Kestrel

BHCC - RS - Edward street Redevelopment

Brighton and Hove City Council · published Mon 27 Oct 2025

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by Trinity Homes UK Ltd in Mar 2025, for £3.2m.

Award notice: BHCC - Hollingbury Library Redevelopment

What you're up against

  • It last went for £3.2m in 2025.

From Brighton and Hove City Council's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The notice doesn't say where the documents are, but Brighton and Hove City Council's other tenders use In-Tend. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

Brighton and Hove City Council (The Council) is currently delivering a residential build programme known as the New Homes for Neighbourhoods programme (https://www.brighton-hove.gov.uk/city-regeneration/new-homes-neighbourhoods/about-new-homes-neighbourhoods). The Council is seeking to engage with the market regarding the development of two available sites either side of Edward Street in Kemptown, Brighton. The site is divided into two lots, one on each side of Edward Street: Oakley House (Lot 1) and Car Park site (Lot 2). Contractors will be able to bid for one or both lots individually via a competitive flexible procedure of 3 stages; Stage 1: PSQ and Quality only. (Shortlist to the top 5 scoring returns), Stage 2: Quality and Price full details released at stage 1 shortlist. Stage 3: Value engineering, full details released with stage 2. Oakley House consists of the demolition of the existing mixed-use building and the creation of a single block with a maximum elevation of 6 stories comprising of 23 flats (1, 2 and 3 bedrooms). All of these units are being built for affordable rent. This site is intended to be delivered through a single stage lump sum JCT 2024 Design and Build contract. Bidders should note that Lot 2 contains a high risk building and will therefore require the successful contractor to take the design through the gateway process. For full details please find the planning application here: Ref: BH2025/02088 https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=T1LATIDMKQ400 The Car Park site consists of the creation of two blocks; one of 12 stories (east), 36 flats (1 bedroom) delivered for over 55's at affordable rent; and one of 6 stories (west),17 flats (1 and 2 bedrooms) delivered for affordable housing. This site is intended to be delivered through a two stage JCT 2024 Design and Build contract. For full details please find the planning application here: Ref: BH2025/02089 https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=T1LB2FDMKQB00 Oakley House consists of the demolition of the existing mixed-use building and the creation of a single block with a maximum elevation of 6 stories comprising of 23 flats (1, 2 and 3 bedrooms). All of these units are being built for affordable rent. This site is intended to be delivered through a single stage lump sum JCT 2024 Design and Build contract. For full details please find the planning application here: Ref: BH2025/02088 https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=T1LATIDMKQ400 The Car Park site consists of the creation of two blocks; one of 12 stories (east), 36 flats (1 bedroom) delivered for over 55's at affordable rent; and one of 6 stories (west),17 flats (1 and 2 bedrooms) delivered for affordable housing. This site is intended to be delivered through a two stage JCT 2024 Design and Build contract. For full details please find the planning application here: Ref: BH2025/02089 https://planningapps.brighton-hove.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=T1LB2FDMKQB00