Kestrel

Kingsway Footpath, Wellingborough remedial works

North Northamptonshire Council · published Sun 23 Aug 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

7 tender documents are on Find a Tender, no login needed.

The notice as published

Remedial works to Kingsway Moreton Avenue, Swanspool Brook Cycle / Foot Path, Wellingborough. Set up compound and welfare facility for security of plant ( out of hours ), material storage area and welfare for staff. Install safety barriers and signs. Saw cut existing surface back to good tarmac. Excavate and dispose of existing surface. Weed kill area of excavation. Install a tack coat emulsion and cold joint to sides. Dispose of all arisings and area left clean Areas Total of 794.88 sq metres.