General Building Construction & Maintenance Framework

Cardiff Council · published Wed 6 May 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by Borley Engineering Services Ltd in Dec 2025.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 8 different firms won this buyer's 3 awards for this kind of work since 2022.

From Cardiff Council's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on Proactis, where the bid is sent too. It's free to register there.

The notice as published

Cardiff Council and the Vale of Glamorgan Council intend to establish a collaborative multi‑lot General Building, Construction and Maintenance Framework to support planned works, reactive maintenance, specialist services, and statutory compliance across their estates. The Framework will comprise a range of lots covering general building, electrical, mechanical, roofing, external works, fire and security, and statutory compliance services, with emergency response sub‑lots linked to parent lots. The Framework will run for three years with an optional one‑year extension and has an estimated total value of £123,514,000.00. Call‑offs will utilise the NEC4 suite. This Competitive Flexible Procedure tender will be conducted in two phases: the Pre‑Selection Questionnaire (PSQ) stage and the Invitation to Tender (ITT) stage. The Contracting Authority will invite the top ten (10) highest ranking suppliers per lot to the next stage who meet the conditions of participation. In the event of tied scores at the 10th position, all suppliers with the same score will be invited to the ITT stage. on, which will be issued when the procurement opportunity is published. During the ITT stage, suppliers will be evaluated on the basis of their quality, cost, and proposed community wellbeing benefits. Following evaluation, successful suppliers will be ranked according to their overall scores per lot. The Councils reserve the right, in accordance with the flexibility permitted under the Competitive Flexible Procedure, to refine, amend or further develop the procurement process and tender documentation following completion of the PSQ stage. Any such modifications—where applied—will be communicated transparently to all PSQ‑qualified suppliers and will apply equally to all participants. It is expected that Tenderers will be able to provide all Works that are in the Scope in- house. However, the Authority recognises that some niche elements of a Scope may need to be sub-contracted. The Potential Client will be required to approve any work that is sub-contracted. Mechanical Works shall include, but not be limited to, the provision of planned, reactive and emergency maintenance, repair, renewal and minor installation works to mechanical building services systems. This includes heating systems, boilers, pipework, pumps, valves, radiators, calorifiers, ventilation and associated plant and equipment. Works may also include system modifications, fault diagnosis, breakdown response, isolations, refilling, balancing and recommissioning. All works shall be undertaken in operational buildings with minimal disruption, in compliance with relevant legislation, guidance and manufacturer requirements. Electrical Works shall include, but not be limited to, planned and reactive maintenance, fault finding, repair, replacement and minor installation works to electrical installations within non‑domestic buildings. This includes lighting, small power, distribution boards, containment, emergency lighting, testing and certification, and associated control equipment. Emergency and out‑of‑hours response works are included where required. All electrical works shall comply fully with current wiring regulations, statutory obligations and Council standards, and shall include appropriate testing, certification and making good on completion. Lot 1 Mechanical Works shall include, but not be limited to, the provision of planned, reactive and emergency maintenance, repair, renewal and minor installation works to mechanical building services systems. This includes heating systems, boilers, pipework, pumps, valves, radiators, calorifiers, ventilation and associated plant and equipment. Works may also include system modifications, fault diagnosis, breakdown response, isolations, refilling, balancing and recommissioning. All works shall be undertaken in operational buildings with minimal disruption, in compliance with relevant legislation, guidance and manufacturer requirements. Electrical Works shall include, but not be limited to, planned and reactive maintenance, fault finding, repair, replacement and minor installation works to electrical installations within non‑domestic buildings. This includes lighting, small power, distribution boards, containment, emergency lighting, testing and certification, and associated control equipment. Emergency and out‑of‑hours response works are included where required. All electrical works shall comply fully with current wiring regulations, statutory obligations and Council standards, and shall include appropriate testing, certification and making good on completion. The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings, nights, weekends, and public holidays (for emergencies and out of hours). . Services shall include attendance within an agreed response time (listed below) to make safe, repair, or mitigate immediate risks, carrying out temporary or permanent emergency works using appropriate labour, tools, equipment, and materials. Works will be limited to essential emergency actions unless further authorisation is obtained. All activities must comply with relevant health and safety legislation and be undertaken by suitably qualified personnel. The contractor shall provide a post‑attendance update and submit a written report detailing actions taken, materials used, and any recommendations for follow‑on works. Cardiff Council Response Times: - 2hr emergency response - attend site within 2hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 24hr emergency response - attend site within 24hrs , make safe and attempt a first-time fix, preauthorised repair up to £1,000. - 5 day routine - attend site within 5 days, preauthorised repair up to £1,000. Lot 1a. General Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, minor internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users. Lot 2 General Building Works shall include, but not be limited to, the delivery of planned, reactive and emergency building maintenance and repair works to occupied and operational non‑domestic buildings, including schools. Works may comprise minor and major fabric repairs, minor internal and external demolitions and alterations, structural repairs, masonry and brickwork, partitions, ceilings, floors, doors and windows, carpentry and joinery, plastering, tiling, decorating and associated finishing trades. The scope also includes adaptation works, minor refurbishments, making good following inspections or incidents, and reinstatement works arising from statutory testing or insurance events. All works shall be undertaken in accordance with relevant standards, specifications and health and safety requirements, with due consideration to safeguarding, business continuity and the minimisation of disruption to building users The contractor shall provide an emergency and out‑of‑hours call‑out service to respond to unforeseen incidents occurring both inside working hours (for emergencies) and outside normal working hours, including evenings,