Tiree Terminal New Building, Marshalling Area & Traffic Management Works

Caledonian Maritime Assets Ltd (Utility) · published Mon 29 Jun 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on Public Contracts Scotland, where the bid is sent too. It's free to register there.

The notice as published

The existing terminal building at Tiree as reached the end of its' serviceable life' and is to be replaced with a new, modern building along with additional works to increase the capacity of the marshalling area and improve the footways and road surfacing. The port will remain operational throughout the construction period. The scope of works includes the demolition of the existing terminal building, erection of temporary terminal buildings, construction of a new ferry terminal building, including the superstructure, roof, external walls, floors, building mechanical and electrical services and all internal finishes. The scope also includes increasing the marshalling area, resurfacing the existing marshalling area and car park, resurfacing existing footpaths and the installation of new road signs and road markings. Once the new terminal building is completed, the ferry operator will vacate the temporary, modular terminal building which will then be required to be removed from site. Construction works require to be phased.