M5 Crossing Project - Sheet Piling

Stroud District Council · published Thu 24 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on ProContract, where the bid is sent too. It's free to register there.

The notice as published

The Works are split into 3 specific areas as follows: • Enabling works – Installing sheet piling through earth and engineered dams both upstream and downstream of the river Frome to provide a robust temporary dam • Permanent works- Install sheet piling both East and West of M5 tying into concrete segregating wall , existing scour piles and existing riverbank. Install capping beam to top of all sheet piles. • Remedial works – Remove sheet piles from the temporary dam and remove from site.