Kestrel

Multi-Disciplinary Consultancy Framework - Peterborough City Council

Peterborough City Council · published Wed 4 Nov 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by XAIS-PTS Limited in Jul 2025, for £31k.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 3 different firms won this buyer's 3 awards for this kind of work in 2025.
  • It last went for £31k in 2025.

From Peterborough City Council's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on ProContract, where the bid is sent too. It's free to register there.

The notice as published

The Services required by the framework agreement, include but are not restricted to the following consultancy services (depending on which lot(s) is applied for, in respect of Peterborough City Council's corporate stock (properties): • Planning Consultancy • Disrepair Surveying • Retrofit Assessment/Coordination • Party Wall Surveying • CDM Principal Design • Health and Safety Advisor (Construction) /Auditing • Dangerous Substances and Explosive Atmospheres Regulations (DSEAR) Consultancy Services • Building Regulations Principal Design • Structural Engineering Consultancy Services • Building Surveying • Stock Condition Surveying • Heritage Consultancy Services • Quantity Surveying • Dilapidation Surveying • Architect Services • Project /Programme Management • Mechanical Electrical Engineering Consultancy • Fire Engineering Consultancy Services • Building Surveying • Architectural • Quantity surveying and cost consultancy • Structural Engineering • M&E Engineering • Heritage and conservation • Sustainability, ESG, and energy consultancy • Project and programme management • Accredited NEC Supervisors and NEC PM's • Planning Consultancy • CDM coordinators/advisors • BRPD under the Building Safety Act • Structural and or Civil design and analysis • Surveys, assessments, and remedial design • Temporary works and structural / civil due diligence • Property inspection and diagnosis • Dilapidations • Technical reports, drawings, specifications and contract documents • Accredited NEC Supervisors and NEC PM's • BRPD under the Building Safety Act • Mechanical and or Electrical design and analysis • Surveys, assessments, and remedial design • Mechanical and or Electrical due diligence • CDM Services • Health and Safety Services • DSEAR services in relation to hazardous substances, etc • Development of Retrospective fire strategies across a varying portfolio of assets • Identification of deficiencies and works required against the retrospective fire strategy • Review of Regulation 38 documentation • Review of EWS and risk management • Consultancy advise and design for construction works