Kestrel

Fulwood Bridge Painting

VIA East Midlands Limited · published Mon 12 Oct 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on Proactis, where the bid is sent too. It's free to register there.

The notice as published

The works shall consist of the preparation and repainting of Fulwood Bridge on the A38 in Sutton in Ashfield, Nottingham. The bridge is a twin deck structure with the section to be painted being the three span steel lattice girder bridge on the north side. Spans to the bridge consist of two side spans measuring 13.3m and a central span of 17.1m. 4x no. lattice girders present connected via cross bracing and supporting a steel trough deck which also requires painting. Lattice girders supported on blue brick piers and abutments. Height of piers to the lattice girders is up to 6.2m