Kestrel

GWR - Paddington Catering Facility Refurbishment Tender

First Greater Western Limited · published Fri 17 Apr 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on s2c-uk62.waxdigital.com, where the bid is sent too. It's free to register there.

The notice as published

The development and delivery of works focused on improving the facilities at Paddington station. To Include: • A comprehensive refurbishment to address significant asset deterioration and operational shortcomings. The works will include the replacement of all existing fridge/freezers with new units and the procurement of additional appliances to meet increased catering demand. • The welfare area will undergo full refurbishment to provide staff with adequate facilities and space, including urgent repairs to water leaks that currently pose safety risks. • A complete ventilation system upgrade is required to resolve dampness and foul odours, ensuring compliance with health and safety standards. • Existing Sanyo air conditioning units, which have reached the end of their serviceable life, will be replaced with modern systems throughout the facility. • The current LED lighting installation appears relatively recent, the electrical services generally require a full renewal to ensure reliability and compliance with current standards. All areas to receive general redecoration throughout.