Kestrel

CEFAS26-85 Contract for provision of Water and Sediment Sampling Analysis for HPC

Centre for Environment, Fisheries and Aquaculture Science · published Tue 27 Oct 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on defra-family.force.com, where the bid is sent too. It's free to register there.

The notice as published

The BEEMS (British EDF Energy Estuarine and Marine Studies) programme is funded by NNB Generation Company (HPC) Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations and require the Supplier to deliver the marine sampling, profiling, and laboratory analysis services described in Section 3 below. Scope of Requirements Cefas require the supplier to acquire sediment and water samples along with water column profiles of conductivity, temperature and depth (CTD) and other variables from a suitable vessel for the purpose of physical and chemical monitoring of the marine offshore environment adjacent to the Hinkley Point C new nuclear build power station. It is anticipated that the required sampling will involve circa 3 days of vessel operations – two days for water sampling and one day for sediment sampling. The requirement includes collection of all samples and field measurements and all laboratory sample analysis, excluding hydrazine analysis which is to be conducted by Cefas laboratory.