Kestrel

Provision of Servicing and Maintenance of the Laundry Production Equipment at Nottingham City Hospital

Nottingham University Hospital NHS Trust · published Tue 17 Nov 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by C A Services (NI) Limited in Oct 2026, for £1.2m.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 3 different firms won this buyer's 3 awards for this kind of work since 2025.
  • It last went for £1.2m in 2026.

From Nottingham University Hospital NHS Trust's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on health-family.force.com, where the bid is sent too. It's free to register there.

The notice as published

The Nottingham University Hospitals NHS Trust (The Client) requires a Supplier for provision of Servicing and Maintenance of the Laundry Production Equipment at Nottingham City Hospital (The service). The purpose of the service is to ensure high quality wash results, reduce the likelihood of costly breakdowns, optimize the Client’s chemical usage and increase the life of the equipment, mitigating the requirement to purchase new assets due to lack of maintenance. Laundry production and subsequently, the Client's organisation would be adversely affected in the event of any prolonged downtime whilst the laundry is operating. Therefore, as a minimum, an engineer must be available on site at any time the laundry is operating. Even a minor issue, such as a machine tripping out, resulting in equipment out of action, would then have a knock-on effect with volume of fresh linen available to the Client's wards, for example. Therefore, a Supplier is required to deliver full on site engineering services to cover planned preventive and reactive servicing and maintenance. The objective is to ensure the Laundry Production Equipment is supported by qualified engineers and is fit for the purpose of enabling the Client’s staff to operate the equipment safely, efficiently and reliably. The Contractor will be required to utilize the Client's digital planned preventative maintenance (PPM) system to provide the service.