Kestrel

EV Charging Infrastructure

National Grid UK Limited · published Wed 30 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

1 tender document is on Find a Tender, no login needed.

The notice as published

National Grid UK requires an effective, compliant and maintainable EV charging infrastructure that covers supply, design participation, installation, commissioning, warranty, on‑site support and ongoing maintenance, together with a dedicated back‑office delivery system to manage connectivity, payments, user support and MI/reporting. The solution must enable safe, reliable and auditable charging for National Grid vehicles and users across a range of site types (substations and offices) and support efficient operational handover between installation and back‑office teams. the supply, installation and commissioning of AC and DC electric vehicle charging equipment Mobile DC electric vehicle chargers that can be easily transported and repositioned between locations. System Operating Platform and Maintenance- Scheduled/Planned and ad hoc.