Brookfield Community School - Replace Underground Heating Pipework
In plain English
The notice doesn't say
The notice as published
Replace existing underground pipework between boiler room and school block B. Isolate and disconnect existing pipework to school block B Create new trench between plantroom and block B Install new pre-insulated pipework in trench Connect to existing in school blocks with new isolation valves Install new spare duct with draw cord Backfill and reinstate surface to match existing Build new brick service entry enclosures Fill, dose and re-commision system Mechanical work by mechanical subcontractor - details to be provide by HCC Works over summer break