Petersfield Highway Maintenance Depot - EVCP Installation
In plain English
The notice doesn't say
The notice as published
Install 4No. Sevadis LCD MaxiChargers pedestal mounted EV Charge Points (mounted back-to-back on two pedestals). To be installed on existing concrete bases completed as part of an infrastructure upgrade project. GRP enclosure, submain and busbar chamber installed dedicated for the EVCP's as part of the infrastructure works. Install new DB with MCCB incomer and integral SPD. All equipment, final circuitry, small power for local socket outlets and heater to be included. Charge points to be networked together and commissioned using local static load management.