T26-072ENV Replacement Boilerhouse Control Panel at Riversdale Leisure Centre
In plain English
The notice doesn't say
Who holds it now
Last won by Devlin Mechanical Ltd in Feb 2026, for £50k.
- T25-153ENV Replacement Gas Boiler and Flue, Council Offices, DerryDevlin Mechanical Ltd £50k
- T23-059ENV Panels of Maintenance ContractorsW Doherty Construction, Danny Wade Plant Hire Ltd, Seasonal Outdoor Services Limited and 10 more £450k
What you're up against
- The last two awards went to different firms: this buyer has changed supplier before.
- 14 different firms won this buyer's 2 awards for this kind of work since 2025.
- It last went for £50k in 2026.
The notice as published
Derry City and Strabane District Council is seeking to appoint a suitably qualified and experienced Contractor to undertake the replacement of the existing boilerhouse control panel with a new Building Management System (BMS) control panel at Riversdale Leisure Centre, 2 Lisnafin Park, Strabane. The new control panel shall be capable of fully controlling the existing boiler plant, heating pumps, ventilation systems, and pool heating plant. It shall also be fully integrated with the Council’s existing BMS infrastructure and be suitable for future connection to a front-end Building Energy Management System (BEMS) system. The existing boilerhouse plant will remain in place, and all services must be maintained throughout the works, with minimal disruption to the day-to-day operation of the facility. The works will include the removal of the existing control panel, installation and integration of the new panel, and all associated wiring, plant interfacing, testing, and commissioning. The Contractor shall ensure that the new control system is fully operational, demonstrated to the Client, and handed over complete with all necessary documentation upon completion. Your submission must be submitted via etendersNI, via this CFT. No other method of submissions will be accepted. Please refer to the CfT documents for further detail.