Framework Agreement for the Supply, installation and maintenance of equipment and infrastructure for the control and management of traffic and related services
In plain English
The notice doesn't say
Who holds it now
Last won by Core Highways (Barrier) Limited in Jul 2026, for £240k.
- Framework Agreement for Road Restraints Systems MaintenanceCore Highways (Barrier) Limited £240k
- Framework Agreement for the execution Road Markings worksGlamorgan White Lining Limited, Nolan Roadmarking Ltd. £960k
- Contract for the Provision of Connections on DNO cable network - Phase 5Centregreat Limited £2.5m
What you're up against
- The last two awards went to different firms: this buyer has changed supplier before.
- 4 different firms won this buyer's 3 awards for this kind of work in 2026.
- It last went for £240k in 2026.
The notice as published
The CONTRACT boundary shall include the AUTHORITY boundaries for: A. Swansea Council B. Neath Port Talbot Council The CONTRACT is referenced as 5 service areas: A. Traffic signals to include traffic signal junctions, toucan crossings, pelican crossings, puffin crossings and PEDEX crossings. For the purpose of this CONTRACT this Service Area shall be known as Traffic Signals. B. Automatic Rising bollards. C. Variable Message, Over-height Vehicle and Driver Information Signs. D. Electrical Testing & Periodic Inspection. E. Non-Routine and Planned Works The CONTRACTOR shall be responsible for locating the cause of all faults or errors and identifying these to the ENGINEER. The CONTRACTOR may also be required to liaise with other suppliers, at their own cost, to undertake a repair. The AUTHORITY reserves the right to issue Task Order works on the behalf of other third-party local authorities, detailed bellow, under the terms of the CONTRACT. A. Neath Port Talbot Council B. Carmarthenshire Council