Who holds it now

Last won by Hitachi Rail GTS ltd in Jul 2025, for £3m.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 5 different firms won this buyer's 3 awards for this kind of work in 2025.
  • It last went for £3m in 2025.

From Translink's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The notice doesn't say where the documents are, but Translink's other tenders use eTendersNI. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

Northern Ireland Railways Company Ltd (NI Railways) is seeking information from qualified and experienced suppliers for the design, manufacture, delivery, installation, testing and commissioning of replacement Train Wash systems at two operational rail maintenance facilities in Belfast: Fortwilliam Train Care Facility and York Road Depot. The project will replace existing train wash systems that have reached the end of their operational life and no longer provide the required cleaning performance. The new installations will support current and future NI Railways rolling stock, including the forthcoming Stadler FLIRT Enterprise fleet. The anticipated scope of works will include, but is not limited to: Design, supply, installation, testing and commissioning of a new bi-directional Train Wash system at Fortwilliam Train Care Facility. Design, supply, installation, testing and commissioning of a new Train Wash system at York Road Depot. Decommissioning and removal of the existing Train Wash systems and associated equipment at both locations. Verification of existing foundations, drainage systems, utilities and structures to confirm suitability for reuse. Adaptation and preparation of existing wash pads and plant rooms to accommodate new equipment. Installation of associated mechanical, electrical, control and compressed air systems. Provision of PLC-based control systems, safety systems, train detection equipment and operator interfaces. Testing, commissioning, operator training and handover of the completed installations. Provision of documentation, manuals, software licences, spare parts support and warranty services. Ongoing technical support and spare parts availability for a minimum period of five years following installation. The Train Wash systems shall be capable of accommodating various NI Railways fleets including CAF Class 3000 and Class 4000 units, the existing Enterprise fleet and the future Stadler FLIRT Enterprise fleet. Works will be undertaken within live operational railway depots and may require suppliers to coordinate with Translink representatives, Principal Designers and specialist contractors while maintaining safe railway operations throughout delivery and installation. Suppliers should demonstrate relevant experience in rail infrastructure, depot-based construction activities, mechanical and electrical installations, and safe working within operational railway environments.