Kestrel

HVAC concept-level study

UK Fusion Energy Ltd · published Wed 16 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by RI Research Instruments GmbH in Aug 2026, for £1.8m.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 2 different firms won this buyer's 2 awards for this kind of work in 2026.
  • It last went for £1.8m in 2026.

From UK Fusion Energy Ltd's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on Delta eSourcing, where the bid is sent too. It's free to register there.

The notice as published

UKFE is seeking to appoint a suitable Supplier (an individual organisation or a consortium with a lead supplier) for a services contract to provide a study for concept designs of Heating, Ventilation and Air Conditioning (HVAC) within the Tokamak building to be built at West Burton Power Station. The study shall provide the technical basis for the development of the facility HVAC architecture and ventilation strategy and shall inform the wider Tokamak Building design. The outputs of the study shall support the development of the building layout, contamination control strategy, nuclear ventilation philosophy, and the preparation of a Rough Order of Magnitude (ROM) cost estimate for the HVAC plant and associated systems. This contract is outcome based with an expected duration of 2 months, with an extension option of up to 2 months incorporated. For more information about this opportunity, please visit the eSourcing portal at: https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Feasibility-study%2C-advisory-service%2C-analysis./5ZTKU772XF To respond to this opportunity, please click here: https://ukfe.delta-esourcing.com/respond/5ZTKU772XF