HVAC concept-level study
In plain English
The notice doesn't say
Who holds it now
Last won by RI Research Instruments GmbH in Aug 2026, for £1.8m.
- Detailed Design and Build of a Compound Cryogenic Pump Prototype (CCPP)RI Research Instruments GmbH £1.8m
- Third Party Verification and Validation of the STEP Whole Programme Cost Estimate Kpmg LLP £210k
What you're up against
- The last two awards went to different firms: this buyer has changed supplier before.
- 2 different firms won this buyer's 2 awards for this kind of work in 2026.
- It last went for £1.8m in 2026.
The notice as published
UKFE is seeking to appoint a suitable Supplier (an individual organisation or a consortium with a lead supplier) for a services contract to provide a study for concept designs of Heating, Ventilation and Air Conditioning (HVAC) within the Tokamak building to be built at West Burton Power Station. The study shall provide the technical basis for the development of the facility HVAC architecture and ventilation strategy and shall inform the wider Tokamak Building design. The outputs of the study shall support the development of the building layout, contamination control strategy, nuclear ventilation philosophy, and the preparation of a Rough Order of Magnitude (ROM) cost estimate for the HVAC plant and associated systems. This contract is outcome based with an expected duration of 2 months, with an extension option of up to 2 months incorporated. For more information about this opportunity, please visit the eSourcing portal at: https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Feasibility-study%2C-advisory-service%2C-analysis./5ZTKU772XF To respond to this opportunity, please click here: https://ukfe.delta-esourcing.com/respond/5ZTKU772XF