LCRCA Consultancy Agreement - Water & Filtration
In plain English
The notice doesn't say
The notice as published
The purpose of this commission is for the Contractor to undertake a feasibility study and cost analysis including anticipated return on investment providing a detailed report focusing on: • The reuse of tunnel sump water for tunnel wall washing. • The reuse of building roof and waste water for flushing building toilets and use in sinks and showers. The Contractor shall undertake the feasibility study following RIBA stages: • RIBA stage 0 - Strategic Definition. • RIBA stage 1 - Preparation and Briefing. • RIBA stage 2 - Concept Design. The feasibility study shall consider the reuse and filtration of sump water to current safe water quality standards considering the production requirements of the tunnel washing operations