Kestrel

Supply of Wastewater Sample Systems

United Utilities Water Limited · published Mon 21 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by 7 Solutions and Breathe Safety Ltd in May 2025, for £1.2m.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 4 different firms won this buyer's 3 awards for this kind of work since 2022.
  • It last went for £1.2m in 2025.

From United Utilities Water Limited's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on EU-Supply, where the bid is sent too. It's free to register there.

The notice as published

United Utilities require the standardisation of the final effluent monitoring stations as part of UU's Project Blueprint programme. Project Blueprint is UU's strategic standardisation programme, focused on creating and deploying standardised assets, systems and solutions across the business. By adopting an industrialised approach to the design, procurement and delivery of assets, Blueprint aims to reduce engineering and commercial effort, improve delivery efficiency, lower whole-life costs and carbon emissions, and enhance operational consistency. All wastewater treatment works require final effluent monitoring. As part of AMP8 we have a large number of sites picking up numeric and phosphorous consents for the first time. Due to these 'first time' and additional consent projects are also coupled with a need to replace/update existing sites monitoring equipment sample systems are required for wastewater. Scope; To provide packaged final effluent monitoring stations using UU Framework Instruments. Instruments/displays are required to be mounted within a GRP kiosk on a suitable backboard arrangement. Variants include but are not limited to; To cover 'standard' sanitary determinants using turbidity (BOD, COD, Suspended Solids) To cover Ammonia & pH To cover p-removal - phosphorous (P and Fe), with space to add pH as an option