Boiler Plant Replacement & Hybrid Controls Integration at Eckington Active, Gosber Street, Eckington
In plain English
The notice doesn't say
The notice as published
NEDDC wishes to appoint a contractor for the design, supply, installation, integration, commissioning and handover of replacement gas-fired boiler plant at Eckington Active. The installation is required to provide supplementary, resilience and back-up heating capacity to the existing ASHP-led heating system.