Kestrel

Lower Thames Crossing (LTC) Owner Controlled Insurance Programme (OCIP) for Follow Insurers

National Highways Limited · published Thu 24 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on Jaggaer, where the bid is sent too. It's free to register there.

The notice as published

National Highways requires follow insurers to provide suitable insurance cover in line with the appointed lead insurers contract of insurance policy for the construction of Lower Thames Crossing. For more information about the project, please follow this link: https://nationalhighways.co.uk/our-roads/lower-thames-crossing/ Lot 1 Contractor All Risks, Primary public liability (£2.5m), Delay in Start Up and Terrorism Lot 4 Excess public liability Limit £50m in excess of £50m Lot 5 Excess public liability Limit £150m in excess of £100m Lot 6 Excess public liability Limit £250m in excess of £250m