Kestrel

Ground Investigation in relation to the Keston Ponds Project

London Borough of Bromley · published Mon 28 Sep 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The notice doesn't say where the documents are, but London Borough of Bromley's other tenders use ProContract. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

The objectives of the ground investigation are: • Characterisation of the embankment dam structures in terms of composition, stratigraphy, and internal condition; • Assessment of seepage pathways, groundwater regime, and hydraulic connectivity between ponds; • Provide geotechnical parameters for the design of foundations for replacement footbridge structures at locations confirmed by the Supervising Engineer. • Characterisation of soils within the proposed river restoration corridor and wetland creation areas; • To monitor the variation in existing groundwater levels within the floodplain prior to restoration works to establish a baseline; • Environmental and waste classification of arisings in support of the earthworks strategy.