Request for Quotations Golf Road Crossing New Inn
In plain English
The notice doesn't say
The notice as published
To supply and install new ELV (48v) traffic signal controller and associated street equipment at the crossing of: Golf Road, New Inn as per drawing below within main suite of documents T944_R400_002 A Also, requirement to remove and relocate existing bus stop provision, as per the drawing specified above and complete all necessary lining works. Civil works such as ducting, NAL retention sockets and dropped kerbs to be completed in October school half term (26th – 30th October) to try and minimise impact and avoid disruption. Traffic Signal works can then be completed when equipment is available.