Gardeen HA Gas Maintenance 2027
In plain English
The notice doesn't say
The notice as published
The work and services to be undertaken comprises the provision of a term maintenance contract for an all-inclusive comprehensive annual inspection, servicing & maintenance contract, with provisional associated replacement works [including boilers, detectors, and associated works] and reporting for approximately 253 domestic and 2 commercial [office] gas central heating installations covering all parts, labour and certification to maintain fully functioning gas fired hot water & heating systems as categorised under the Right to Repair Statutory Scheme in the Employer’s tenanted flats/ houses (which quantity may vary from time to time) in Barlanark, Glasgow G33. The tender documents comprise (1) the SPD document [minimum selection standards] which is accessible via the SPD Module in the PCS Contract Notice; (2) the Specification of Works [contract & tender pricing document]; and (3) your Contractor Design Proposals [CDP], which will be your tender quality submission. The tender evaluation will comprise: the SPD pass/ fail, your quality score for your Contractor Design Proposals [CDP]; and the Contract Sum stated on the Form of Tender. The submitted SPD will assess the selection criteria as a pass or fail to identify contractors who pass by meeting the specified criteria. Only those contractors who achieve an SPD pass will have their tender quality and cost considered/ evaluated. The criteria for scoring will be to reach a total percentage score as follows: Quality- Contractor Design Proposals [CDP] scoring will be maximum 100 marks, submissions ranked in relation to the other candidates based on the Employer’s stated aspirations/ requirements and the information provided by the candidate(s). The Contractor Design Proposal [CDP] scores will be converted to a percentage, prior to weighting. Price (tender)- deducting 1% from 100 for every percentage point each tender is in excess of the lowest tender, prior to weighting. Additional information: Candidates must refer to the Instructions to Tenderers and Project Criteria at pages 3-14 of the Specification of Works which state important information regarding the tender requirements and process.