Kestrel

Cornwall Waste Needs Assessment

Cornwall Council · published Thu 8 Oct 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The notice doesn't say where the documents are, but Cornwall Council's other tenders use ProContract. Register there (it's free) and look for this tender, or email the buyer's contact on the notice.

The notice as published

Stage 1 – Review of Existing Evidence • Review existing waste planning evidence, national guidance and relevant legislation. • Review current Cornwall waste policies and any relevant neighbouring Waste Planning Authority evidence. • Agree methodology, assumptions, datasets and forecasting approach with Cornwall Council. Stage 2 – Assessment of Existing Waste Management Capacity Prepare an assessment of existing waste management capacity across Cornwall including: • Current operational waste management facilities. • Existing Waste Planning Permissions. • Environmental Permits/Waste Management Licences. • Annual throughput using the Environment Agency Waste Data Interrogator. • Survey and verification of operational waste sites. • Existing treatment capacity by waste stream and facility type. • Analysis of operational constraints where relevant. Stage 3 – Assessment of Future Waste Arisings Prepare forecasts of future waste arisings throughout the Local Plan period including: • Local Authority Collected Waste. • Commercial and Industrial Waste. • Construction, Demolition and Excavation Waste. • Hazardous Waste (where appropriate). • Other relevant waste streams such as wastewater, agricultural waste, low level radioactive waste, clinical waste Forecasts should consider: • Population growth. • Housing and employment growth. • Economic forecasts. • Historic waste trends. • Recycling and composting targets. • National policy objectives. • Waste reduction initiatives and changes in waste composition. Stage 4 – Assessment of Additional Waste Management Capacity Requirements Using the findings of the previous assessments, identify: • Existing capacity available throughout the plan period. • Forecast demand for each waste stream. • Capacity surpluses and deficits. • The quantity and type of additional waste management capacity required. • The broad timing of additional provision. • Any implications for future waste site allocations or safeguarding policies. The assessment should clearly identify where sufficient capacity exists and where additional facilities may be required to meet future needs. A Cross Boundary Waste Movements paper A separate technical paper should assess: • Current waste imports and exports between Cornwall and neighbouring Waste Planning Authorities. • Waste arisings within neighbouring authority areas where relevant. • Nationally significant waste management requirements. • Existing and future cross-boundary waste movements. • Whether existing or planned facilities are capable of continuing to accommodate these movements.