BCU-ITT-64220 - Substation 4 Switchgear Upgrade -WMH
In plain English
The notice doesn't say
The notice as published
Betsi Cadwaladr University Health Board requires a suitably qualified and experienced electrical engineering contractor to undertake the phased replacement and upgrade of the Low Voltage (LV) switchgear infrastructure within Substation 4 at Wrexham Maelor Hospital. The project forms part of the Nucleus Phase 1 programme and is intended to improve the resilience, reliability and operational flexibility of the hospital’s electrical distribution network. Please note that a JCT Intermediate Building Contract will be utilised for this tender. Attendance at a site visit is a mandatory requirement. Failure to attend the site visit may result in disqualification from the tender process. To arrange a site visit, please contact: • Ben Humphreys - Ben.Humphreys@wales.nhs.uk - Tel - 03000848537 • Paul Jones - Paul.Jones5@wales.nhs.uk - Tel – 03000848525