Who holds it now

Last won by Westley Building Contractors Limited in Feb 2025, for £83k.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 3 different firms won this buyer's 3 awards for this kind of work in 2025.
  • It last went for £83k in 2025.

From Fareham Borough Council's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on sebp.due-north.com, where the bid is sent too. It's free to register there.

The notice as published

Fareham Borough Council is seeking expressions of interest from suitably qualified and experienced contractors for the proposed Arcading refurbishment of Fareham Shopping Centre, with an estimated project value of £6.5M. The project forms part of the Council's wider regeneration ambitions for Fareham Town Centre, aimed at improving the shopping environment, enhancing the visitor experience and supporting the long-term vitality and attractiveness of the town centre. The proposed works involve the refurbishment and enhancement of internal shopping malls, public circulation areas, communal facilities and entrances. Operational and delivery requirements Fareham Shopping Centre is an operational retail destination, accommodating multiple commercial occupiers and receiving regular public footfall. A key requirement of the project will be the successful delivery of construction works while maintaining the safe and effective operation of the shopping centre. The Council is therefore particularly interested in contractors who can demonstrate experience in: • Delivering refurbishment works within occupied and operational retail or commercial environments. • Developing and implementing phased construction programmes to minimise disruption to retailers, customers and other building users. • Maintaining safe public access, pedestrian circulation, emergency escape routes and servicing arrangements throughout construction. • Planning and undertaking works outside normal trading hours, including evenings, nights and weekends, where necessary. • Managing construction logistics, deliveries, waste removal, temporary hoardings and site segregation within constrained and publicly accessible environments. • Coordinating works with shopping centre management, tenants, facilities management teams and other stakeholders. • Managing health and safety, noise, dust, vibration and other construction impacts within a live environment. • Delivering high-quality finishes while maintaining programme, cost and quality controls. The Council is particularly interested in engaging contractors with demonstrable experience in delivering refurbishment projects of a similar nature, scale and complexity within live, operational shopping centres or comparable high-footfall commercial environments. The proposed refurbishment programme is expected to include, but may not be limited to, the following: Entrances Façade: Three existing entrances to the centre (North, South and East,) will be reclad in anodised aluminium cladding and areas of external porcelain tiles. With external grade mortar to match tiles. The current size of tiles ensures mortar can be used to fix, if they tiles become larger or panels, then it will need to be reviewed it mechanical fixings are required. Secondary support posts are required to the parapets to structural engineers details and weathered into the existing roof structure. Metal Arches: Anodised aluminium arches are placed with angles onto the existing façade structure. Some entrances have anodised aluminium baffle / brie solei panels fixed to the arches. These need to be demountable to access the windows behind for maintenance. Pilasters: The existing external pilasters will be reclad with small, external porcelain tiles with an anodised aluminium skirting fixed to external grade plywood. Corners of tiles to have robust metal trims suitable for external use. Copings: to the entrance roofs are to be replaced with PPC aluminium coloured to match the cladding. Marine environment: All cladding, fixtures, fittings, mortars and lighting all need to be suitable for external, marine environments. Soffit: To be reclad in anodised aluminium planks fixed to support frames fixed to the underside of the existing concrete soffits. With access hatches allowed for to reach services behind. Soffit lighting: External grade bulb lighting is to be fixed to the underside of the soffits to specialist details. services: Existing drainage and services are to be retained and access allowed for ongoing maintenance. Doors / screens: Existing glazed doors and screens are to be removed and replaced with glazed screens and automatic SMART sliding doors and swing doors. The smart system needs weather detection to fail close in adverse weather conditions. The doors need to fail open in the event of a fire. The mullions and frame colour are to match the external cladding colour. U values to Building Regulations. The clear widths of the doors are to be in accordance with the Fire strategy. Metal protection posts are to be installed externally around doors fixed down to concrete and external paving or tarmac made good around them. The West entrance is to be wide enough to allow vehicle access. Matwell: Existing matwells are to be retained with new hard wearing matting installed. Over head heater: Existing overhead door heater at the entrance doors is to be replaced to suit new door layout. External Floor: The existing paving or tarmac is to be made good where the door barriers are placed. The existing tactile paving is to be removed and new instated to suit the revised door layouts, and made good to suit existing. Mall refurbishment – North and South: Floors: The existing terrazzo mall floors are to be prepared ready to installation of new resin floor, with suitable slip resistance and suitable for vehicle access. In a variety of colours and pattens. Existing expansion joints to be retained and silicone installed in joint to match resin. Existing inspection chambers are to have resin applied over them and ensure they are still accessible. The bronze BT boxes are to be retained as they are. Raised steps and ramps in squares: The raised areas of steps and ramps are to have resin applied with metal angles on the edges to run up to. Pilasters: The existing pilasters are to have a layer stripped back, backer board added and ceramic tiles installed with mortar to match the tiles. Tiles are to run full height of the pilasters. Skirtings are to be PPC aluminium on plywood. Circular columns to square: Existing circular columns are to have backer board and new, small individual ceramic tiles installed. Tiles are to run full height of the columns. Skirtings are to be PPC aluminium on plywood. Roller shutters: There are two new, perforated security roller shutters installed either side of the Westbury square mall. These are installed to existing soffits and new secondary support and posts to Structural engineer’s details. Support posts are to be overclad with anodised aluminium to match colour of roller shutter frame. The guides to the roller shutters are to be recessed within the tiles to the pilasters or the metal of the posts. Ceilings: The central areas of mall ceilings are to be removed and new plasterboard ceilings with support system installed to the existing concrete soffits. These are to be painted. Access hatches are to be installed to M&E requirements. The existing ventilation grilles are to be removed with existing support structure and new steel metal baffles are to be installed with a new support system fixed to the existing concrete soffit. Access hatches are to be installed in the baffles to suit M&E requirements with end caps used. The existing coffered ceiling details are retained and these are to be repainted with new LED light strips installed. The existing ceiling all around the perimeter of the malls and where it meets the shopfronts are to be retained and repainted. Lighting and services to ceilings: The baffle ceilings are to have new spotlights recessed within the void between the baffles. These are to be fixed to new support systems from the existing concrete soffit. A new 250mm wide metal aluminium channel painted bronze / copper is to be installed recessed into the new plasterboard ceilings. New spotlights are to be installed suspended from a new support system from the existing soffits. The existing speakers are to be relocated into the channel. The existing fire alarms and sprin