NLB Oban Buoy Store Mess Facility

Northern Lighthouse Board · published Tue 3 Nov 2026

In plain English

  • Northern Lighthouse Board wants a contractor to convert a mezzanine attic above a small tools workshop at its Oban base into a tearoom, including strengthening the floor, new partitions, an external stairway, electrics, ventilation, plumbing and kitchen fittings.
  • Works must be done while the depot stays operational, with a mandatory site visit on 17 November 2026.

The notice doesn't say

  • Whether staff transfer to you (TUPE)
  • Whether it suits small firms

These are usually in the tender documents.

Who holds it now

Last won by TRAC HLM Ltd in May 2026, for £141k.

What you're up against

  • The last two awards went to different firms: this buyer has changed supplier before.
  • 3 different firms won this buyer's 3 awards for this kind of work since 2025.
  • It last went for £141k in 2026.

From Northern Lighthouse Board's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on Delta eSourcing, where the bid is sent too. It's free to register there.

The notice as published

The works comprises of repurposing a mezzanine attic space into a tearoom which is above a small tools workshop within the Buoy Store building at the NLB Oban base. Scope of works •Strengthening of existing mezzanine floor with additional timber joists and steelwork support. •New fire rated ceiling to small tools workshop. •Steelwork framing at new external doorway and removal of existing dado railing. •New partition wall supported off strengthened floor extending up to underside of roof. •Forming new internal window looking out to gantry crane room in the Building. •Construction of new lobby partition with door. •Design, fabrication and installation of external stairway. •Forming new external doorway with door at first floor level leading to external stairway. •Installation and commissioning of electrical supply, lights, data & fire detection. •Installation of new extract ventilation for tearoom. •Provision of water supply and waste plumbing to tearoom. •Installation of new kitchen units, including sink, and all fittings. •Decorating walls and ceilings and fitting new floor coverings. All works to comply with with Building (Scotland) Regulations 2004 and all subsequent amendment regulations. The project must be delivered while maintaining the depot as a live operational base. All drawings, specifications and project information are included in the tender document package along with submission requirements within Delta. Mandatory site visit is scheduled for 17th November 2026, confirmation of attendance to be given through Delta message centre. Works to begin 4th January 2027 and expected to be completed by 31st March. For more information about this opportunity, please visit the eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Construction-work./CS4Q635C4H To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/CS4Q635C4H