Building Management System Upgrade to Ysbyty George Thomas Hospital
In plain English
The notice doesn't say
The notice as published
Direct award call-off under the SBS10166 Hard Facilities Management 2 Framework Lot 1.1 Building Management Systems for the upgrade of the Building Management System (BMS) at Ysbyty George Thomas (YGT) Hospital. The existing BMS at YGT is operated via legacy trend controls that require an upgrade and enhancement to improve system performance, reliability and integration with existing building services infrastructure. The upgrade to the Honeywell CPO controllers will support backlog maintenance priorities, improve energy efficiency and ensure continued compliance with NHS Wales estates and operational standards. The BMS system is a closed protocol system and the upgrade can only be undertaken by the Original Equipment Manufacturer (OEM), Honeywell Building Solutions. The existing Building Management System (BMS) at Ysbyty George Thomas (YGT), Treorchy, Rhondda Cynon Taff is operated via legacy trend controls that require an upgrade and enhancement to improve system performance, reliability and integration with existing building services infrastructure. The upgrade to the Honeywell CPO Controllers will support backlog maintenance priorities, improve energy efficiency and ensure continued compliance with NHS Wales estates and operational standards. The BMS system is a closed protocol system and the upgrade can only be undertaken by the Original Equipment Manufacturer (OEM) which is Honeywell Building Solutions. The Health Board has also standardised on the one BMS system where the Honeywell CPO Controllers are already installed at the Royal Glamorgan Hospital (RGH). In order to allow control and monitoring over both systems, an upgrade is necessary as, without it, YGT won't be able to connect to RGH's and be unable to provide insights into the BMS system performance to identify maintenance savings opportunities and energy saving through operational improvements.