Dryburn Footbridge Replacement - PROW 302146

Westmorland and Furness Council · published Thu 19 Nov 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

Who holds it now

Last won by Metcalfe Plant Hire Limited in Sep 2026, for £99k.

Award notice: CWF Lot 2a - Reconstruction of Newbiggin Manor Farm Culvert

What you're up against

  • It last went for £99k in 2026.

From Westmorland and Furness Council's earlier award notices for the same kind of work. The tender documents usually say which contract this one replaces.

The documents are on ProContract, where the bid is sent too. It's free to register there.

The notice as published

The Authority is seeking a contractor to design and build a new 34 metre two span footbridge over the South Tyne River along Public Right of Way 302146, near the area known as Dryburn near Garrigill and in the Alston parish. The bridge will be required to be at 1.2 minimum walking width, with a pier design suitable for the frequent flash flooding that led to the previous footbridge failing. The PRoW forms part of the Pennine Way National Trail and the work will need to be carried out to National Trails Quality Standards. The bridge would sit within the Alston parish and nearby the remote village of Garrigill, a remote location within the North Pennines National Landscape. The project is to be let as a 2 stage Design and Build contract with the contractor being responsible for completion of a full design and obtaining all necessary consents, permits and orders (Stage 1) to allow construction works (Stage 2) to commence as soon as possible after 1st April 2028 (subject to funding), and where required making best use of the in-river working window of 16th June to 30th September.