DfI Rivers Directorate T-1163 Inspection and Maintenance of Underground Infrastructure Framework
In plain English
The notice doesn't say
Who holds it now
Last won by John Mcquillan (Contracts) Limited in Sep 2026, for £5.2m.
- DfI TRAM T-1170 Interim Surfacing Contract 2026 - ISCS1 Down John Mcquillan (Contracts) Limited £5.2m
- DfI TRAM T-1172 A4 Annaghilla Road Carriageway Resurfacing Gibson Quarries (Banbridge) Limited £1.8m
- DfI TRAM T-1171 Interim Surfacing Contract 2026 - ISCW1 Dungannon FP Mccann Limited £5.2m
What you're up against
- The last two awards went to different firms: this buyer has changed supplier before.
- 3 different firms won this buyer's 3 awards for this kind of work in 2026.
- It last went for £5.2m in 2026.
The notice as published
The Department for Infrastructure Inspection and Maintenance of Underground Infrastructure Framework will include the following work activities: A) Desilting of Culverts B) CCTV and Fly-through Surveys of Culverts C) Trenchless / Specialist Repairs of Culverts D) Traffic Management, Gaining Access to Culverts, Associated Civil Works E) Small Scale Civil Works F) Underground Man Entry Repairs The Framework will comprise of three area Lots (Works Orders valued up to £300k) covering the following areas: IMUF 1 - Greater Belfast; IMUF 2 - Coleraine, Omagh and Fermanagh; IMUF 3 - Armagh and Lisburn. Please note: For this procurement, Suppliers submissions are required to be uploaded via the eTendersNI CfT under Lot 1: IMUF 1 (Greater Belfast Area). This will serve as the central submission point for all Lots. Suppliers should submit their responses for every Lot they are tendering for within this single location. ICC Measured Term Contract for works within the Greater Belfast Area (Works Orders valued up to £300k). The proposed contract relates to works with a cumulative value of £2.6m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £3.25m (ex VAT). ICC Measured Term Contract for works within the Armagh and Lisburn Areas (Works Orders valued up to £300k). The proposed contract relates to works with a cumulative value of £1.56m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £1.95m (ex VAT). ICC Measured Term Contract for works within the Coleraine, Omagh and Fermanagh Areas (Works Orders valued up to £300k). The proposed contract relates to works with a cumulative value of £1.5m (ex VAT) over a four year term. If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under this Framework may be extended for a further period or periods up to a maximum of 12 additional months. This may increase the value to £1.5m (ex VAT).