Kestrel

Telemetry Engineering Support Services

Scottish Water · published Tue 24 Nov 2026

In plain English

Reading the notice and writing a summary. This takes a few seconds the first time.

The documents are on Atamis, where the bid is sent too. It's free to register there.

The notice as published

Scottish Water is establishing a Framework Agreement for Telemetry Engineering Support Services, covering the survey, supply, installation, commissioning, decommissioning and documentation of Remote Telemetry Units (RTUs) and associated communications equipment across Scottish Water's water and wastewater asset base, together with reactive telemetry support. Services may be required anywhere in Scotland, so Suppliers must be able to service all geographic areas.<br/><br/>The scope includes, but is not limited to:<br/><br/>- Desktop and on-site surveys of existing and future telemetry installations, including communications surveys (e.g. 4G, SOGEA, FTTP).<br/>- Procurement of RTUs and associated equipment through Scottish Water's mandatory RTU framework, and Factory Acceptance Testing (FAT) prior to delivery to site.<br/>- Supply and installation of RTU associated communications equipment in accordance with Scottish Water specifications (antennas, surge and lightning protection, cable containment, marshalling, relays, signal conditioners, Modbus PLC communications, data gatherers and inter-site comms).<br/>- Programming and end to end (source to screen) commissioning and testing of new and existing plant monitored by the telemetry top end, including hot swaps of live RTUs.<br/>- Decommissioning of RTUs and associated equipment, including safe removal, return of spares and WEEE compliant disposal.<br/>- Production of IO tag sheets, mimics, risk assessments and method statements, commissioning and FAT records, Ready to Go Live documentation and Operation and Maintenance manuals, in line with Scottish Water procedures and a Common Data Environment aligned to ISO 19650.<br/>- Training for Scottish Water Electrical and Mechanical (E&M) support staff on installed telemetry.<br/>- Additional on-site support to Scottish Water E&M teams for communications failures, reactive faults and minor enhancements, and to supplement Scottish Water maintenance teams during periods of high breakdown volumes or staff shortages.<br/><br/>Work will be delivered on assets within Scottish Water's Operational Technology environment, which is in scope of the Network and Information Systems (NIS) Regulations, in accordance with Scottish Water's Telemetry Realisation Process, telemetry procedures and Engineering Specification Section 633 - Telemetry. The Supplier will act as Principal Contractor only and must provide its own base facilities, as Scottish Water will not make premises available.<br/><br/>Call-off contracts will be awarded under the Framework by direct allocation or mini-competition. Scottish Water may appoint more than one Supplier. Appointment to the Framework does not guarantee any volume or value of work.<br/><br/>This opportunity is aimed at telemetry, SCADA, instrumentation and controls and electrical engineering contractors with proven capability in delivering telemetry installations on operational water and wastewater assets, a competent and suitably qualified workforce, and the capacity to respond across Scotland. Scottish Water is seeking to appoint Suppliers to a Framework Agreement for the provision of Telemetry Engineering Support Services. The Framework will support the survey, supply, installation, commissioning, decommissioning and documentation of Remote Telemetry Units (RTUs) and associated communications equipment on Scottish Water's water and wastewater assets, for both new and existing works, together with reactive telemetry support to Scottish Water's Electrical and Mechanical (E&M) teams.<br/><br/>Services may be required across all of Scotland. Suppliers must therefore be able to service all geographic areas of Scotland.<br/><br/>This notice is intended to help prospective Suppliers understand the nature and breadth of the services so that those with the right capability and capacity can decide whether to participate.<br/><br/>The scope of services includes, but is not limited to, the following.<br/><br/>Surveys<br/><br/>- Desktop and on-site surveys of existing telemetry installations.<br/>- Desktop and on-site surveys for future telemetry installations.<br/>- Communications surveys (desktop and on site) to establish the communications options available for future installations and to document existing communications (e.g. 4G, SOGEA, FTTP).<br/>- Surveys will identify hazards and limitations relevant to the telemetry installation, its function and site access, and will record the location, type and function of the RTU and its associated communications equipment, any integration with control systems (PLC and SCADA), the electrical supply, cable ways and marshalling arrangements.<br/><br/>Remote Telemetry Units and associated equipment<br/><br/>- Procurement of Framework approved RTUs and associated equipment via Scottish Water's approved supply chain. Use of Scottish Water's RTU framework (currently SW20/CI/1285/1 - Supply of Remote Telemetry Units, or any successor or replacement framework) is mandatory.<br/>- Factory Acceptance Testing (FAT) of RTUs before delivery to site.<br/>- Supply and installation of RTU associated communications equipment in accordance with Scottish Water specifications, including antennas, surge protection, lightning protection, cable containment, marshalling junction boxes, knife edge terminations, relays, signal conditioners (24v / 0-20mA), PLC communication via RS485 Modbus protocol, 230v unswitched fused spurs, data gatherers and inter-site communications.<br/>- Where ancillary electrical work is required, design, supply, installation, testing and commissioning in compliance with BS 7671, the Electricity at Work Regulations 1989 and applicable UK water industry standards, including relevant WIMES, Scottish Water specifications and Sewers for Scotland.<br/><br/>Programming, testing and commissioning<br/><br/>- Programming of RTUs and completion of the IO and mimic configuration based on Scottish Water design packages.<br/>- End to end (source to screen) commissioning of all new and existing plant monitored by the telemetry top end, including hot swaps of live RTUs and signal additions or modifications, in collaboration with Scottish Water's Telemetry Engineering Support Team (TeST) and Specialist Service Delivery (SSD) team.<br/>- Close liaison with Scottish Water Operations, principal partners and control centre staff to plan and coordinate testing.<br/><br/>Decommissioning<br/><br/>- Decommissioning of telemetry RTUs and associated equipment. Equipment is to be removed from site unless otherwise instructed, with any equipment left in place made safe and labelled.<br/>- Return of spares to Scottish Water where instructed, and safe disposal of removed equipment in accordance with WEEE and other relevant legislation.<br/>- Removal and making safe of redundant power supplies, RTU cards and cabling, and updating of enclosure labelling where existing enclosures are reused.<br/><br/>Documentation and information management<br/><br/>- Production of IO tag sheets and mimics based on the design package provided by Scottish Water or its partners.<br/>- Risk assessments and method statements in compliance with Scottish Water requirements.<br/>- Testing documentation, including commissioning records and FAT documentation.<br/>- Ready to Go Live (RtGL) documentation in accordance with Scottish Water SSD and TeST procedures and standards.<br/>- Operations and Maintenance (O&M) manuals in accordance with Scottish Water procedures and standards.<br/>- Compliance with Scottish Water's Common Data Environment requirements for the SR27 regulatory period (Autodesk Forma), including alignment to ISO 19650, naming conventions, metadata, folder structures, workflows and product data.<br/><br/>Training<br/><br/>- Training for local Scottish Water E&M support staff on the telemetry RTU installed, including anything non-standard or specific to the site, rather than generic manufacturer information only.<br/><br/>Maintenance and reactive s